Carrier Aquazone 50WD handleiding
Handleiding
Je bekijkt pagina 3 van 84

3
GENERAL
This Installation and Start-Up Instructions literature is for
Aquazone™ water source heat pump systems. Water source heat
pumps (WSHPs) are single-package horizontally and vertically
mounted units with electronic controls designed for year-round
cooling and heating.
See Fig. 1 for model number nomenclature details. See Tables 1
and 2 for unit physical data.
PRE-INSTALLATION
INSPECTION
Upon receipt of shipment, carefully check the shipment against
the bill of lading. Make sure all units have been received. Inspect
the carton or crating of each unit, and inspect each unit for damage
on both the interior and exterior. Ensure the shipping company
makes proper notation of any shortages or damage on all copies of
the freight bill.
Concealed damage not discovered during unloading must be
reported to the shipping company within 5 days of receipt of
shipment.
NOTE: It is the responsibility of the purchaser to file all necessary
claims with the shipping company.
STORAGE
If the equipment is not needed for immediate installation upon its
arrival at the job site, it should be left in its shipping carton and
stored in a clean, dry area between 50 and 95°F. Units must only
be stored or moved in the normal upright position as indicated by
the UP arrows on each carton at all times. If unit stacking is
required, stack units as follows: vertical units less than 6 tons, no
more than two high; horizontal units less than 6 tons, no more than
three high. Do not stack units larger than 6 tons.
WARNING
Electrical shock can cause personal injury and death. Shut off
all power to this equipment during installation. There may be
more than one disconnect switch. Lockout/tagout all discon
-
nect locations to alert others not to restore power until work is
completed.
IMPORTANT: The installation of water source heat pump units
and all associated components, parts, and accessories which
make up the installation shall be in accordance with the
regulations of ALL authorities having jurisdiction and MUST
conform to all applicable codes. It is the responsibility of the
installing contractor to determine and comply with ALL
applicable codes and regulations.
IMPORTANT: Read the entire instruction manual before
starting installation.
Bekijk gratis de handleiding van Carrier Aquazone 50WD, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Carrier |
Model | Aquazone 50WD |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 15865 MB |