Carrier WeatherMaker 48GE handleiding

80 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 1 van 80
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53480510-01 Printed in U.S.A. Form No. 48GE-17-28-01SI Rev A Pg 1 3-25 Replaces: New
Installation Instructions
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . 1
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Rated Indoor Airflow (cfm) . . . . . . . . . . . . . . . . . . . . . 3
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Jobsite Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Step 1 — Plan for Unit Location . . . . . . . . . . . . . . . 20
ROOF MOUNT
Step 2 — Plan for Sequence of Unit Installation . . 20
CURB-MOUNTED INSTALLATION
PAD-MOUNTED INSTALLATION
FRAME-MOUNTED INSTALLATION
Step 3 — Inspect Unit . . . . . . . . . . . . . . . . . . . . . . . . 20
Step 4 — Provide Unit Support . . . . . . . . . . . . . . . . 21
ROOF CURB MOUNT
SLAB MOUNT (HORIZONTAL UNITS ONLY)
ALTERNATE UNIT SUPPORT (IN LIEU OF CURB OR
SLAB MOUNT)
Step 5 — Field Fabricate Ductwork . . . . . . . . . . . . . 25
Step 6 — Rig and Place Unit . . . . . . . . . . . . . . . . . . 25
POSITIONING ON CURB
Step 7 — Horizontal Duct Connection . . . . . . . . . . 26
Step 8 — Install Outside Air Hood - Factory Option . 26
Step 9 — Assemble Barometric Hood . . . . . . . . . . 27
BAROMETRIC HOOD (VERTICAL CONFIGURATION)
BAROMETRIC HOOD (HORIZONTAL
CONFIGURATION)
Step 10 — Install Flue Hood and Combustion Air
Hood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Step 11 — Install Gas Piping . . . . . . . . . . . . . . . . . . 29
GAS SUPPLY LINE
FACTORY OPTION THRU-BASE CONNECTIONS
Step 12 — Install External Condensate Trap and
Line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Step 13 — Make Electrical Connections . . . . . . . . . 31
FIELD POWER SUPPLY
UNITS WITHOUT FACTORY-INSTALLED NON-
FUSED DISCONNECT OR HACR
UNITS WITH FACTORY-INSTALLED NON-FUSED
DISCONNECT OR HACR
ALL UNITS
CONVENIENCE OUTLETS
FACTORY OPTION THRU-BASE CONNECTIONS
UNITS WITHOUT THRU-BASE CONNECTIONS
FIELD CONTROL WIRING
THERMOSTAT
UNITS WITHOUT THRU-BASE CONNECTIONS
HEAT ANTICIPATOR SETTINGS
TRANSFORMER CONNECTION FOR 208 V POWER
SUPPLY
Humidi-MiZer
®
System Control Connections . . . . . 36
HUMIDI-MIZER — SPACE RH CONTROLLER
Typical Unit Wiring Diagrams . . . . . . . . . . . . . . . . . .37
Integrated Gas Controller . . . . . . . . . . . . . . . . . . . . .44
Leak Dissipation System . . . . . . . . . . . . . . . . . . . . .47
SEQUENCE OF OPERATION
LEAK DISSIPATION SYSTEM SELF-TEST
TROUBLESHOOTING
Humidi-MiZer Dehumidification System
(Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50
NORMAL COOLING
DEHUM/MECH COOLING (SUBCOOLING) MODE
DEHUMIDIFICATION (HOT GAS REHEAT) MODE
REHEAT CONTROL
Temporary Furnace Operation During
Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51
EconomizerONE (Factory Option) . . . . . . . . . . . . . .52
ECONOMIZER SETTINGS
•WIRING
SETUP AND CONFIGURATION
INSTALLING OPTIONAL HH57LW001 SINGLE
OUTSIDE AIR ENTHALPY SENSOR
CHECKOUT
TROUBLESHOOTING
Adjust Factory-Installed Options . . . . . . . . . . . . . . .73
SMOKE DETECTORS
ECONOMIZERONE OCCUPANCY SWITCH
Step 14 — Install Accessories . . . . . . . . . . . . . . . . .73
Step 15 — Fan Speed Set Up . . . . . . . . . . . . . . . . . .73
UNITS WITH ELECTROMECHANICAL CONTROLS
UNITS WITH SYSTEMVU™ CONTROLS
COMPRESSOR ROTATION . . . . . . . . . . . . . . . . . . . .75
PRESSURE RELIEF VALVES . . . . . . . . . . . . . . . . . .76
FASTENER TORQUE VALUES . . . . . . . . . . . . . . . . .76
START-UP CHECKLIST . . . . . . . . . . . . . . . . . . . . . CL-1
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified service personnel should install, repair, or
service air-conditioning equipment.
Untrained personnel can perform basic maintenance functions of
cleaning coils and filters and replacing filters. All other operations
should be performed by trained service personnel. When working
on air-conditioning equipment, observe precautions in the
literature, tags and labels attached to the unit, and other safety
precautions that may apply.
Follow all safety codes, including ANSI (American National
Standards Institute) Z223.1. Wear safety glasses and work gloves.
Use quenching cloth for unbrazing operations. Have fire
extinguisher available for all brazing operations.
It is important to recognize safety information. This is the safety-
alert symbol . When you see this symbol on the unit and in
WeatherMaster
®
48GE**17-28
Single Package Rooftop
with Gas Heat/Electric Cooling
and EcoBlue™ Fan Technology

Bekijk gratis de handleiding van Carrier WeatherMaker 48GE, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkCarrier
ModelWeatherMaker 48GE
CategorieNiet gecategoriseerd
TaalNederlands
Grootte10499 MB