Schneider HEPD80 handleiding

24 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 7 van 24
NHA58709 HEPD 80 Flush Mounting Kit
01/2016 Instruction Bulletin
© 2016 Schneider Electric USA, Inc. All Rights Reserved
7
For troubleshooting, call the Surgelogic Technical Assistance Group at 1-800-577-7353.
ENGLISH
Operating and Testing 1. Turn on the two-pole circuit breaker feeding the SPD.
2. Replace all devices, doors and covers.
3. Restore power to the power panel. If the electrical and grounding sections are
installed correctly the green lights on the AC section of the SPD will be on. If
neither of the lights are on, turn off the power and review all steps of 'mounting'.
4. Periodically check the green lights on the AC surge suppression device to ensure
that they are illuminated. If one or both the green lights go out, it indicates that AC
power or suppression has been lost.
Released for Manufacturing
Printed on 2016/08/08

Bekijk gratis de handleiding van Schneider HEPD80, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSchneider
ModelHEPD80
CategorieNiet gecategoriseerd
TaalNederlands
Grootte2762 MB