JANDY CD100 handleiding
Handleiding
Je bekijkt pagina 18 van 24

Page 18
Jandy
®
Pro Series Ozone Generator
Section 4. Ozone Generator Operation
4.1 Pool Preparation Before Startup
To achieve optimal performance from the ozone system, the pool or
pool/spa combo must be as clean as possible to begin. Perform the
following pool preparation steps prior to initial system start-up:
1. Backwash or clean filters one day before starting the ozone
generator.
2. Super chlorinate the pool water using a chlorine-based shock
treatment prior to ozone system start-up.
3. Test the pool water chemistry and adjust as necessary (see
following guidelines, Section 4.2). Repeat testing often and adjust
water chemistry as necessary for optimal ozone performance.
4. Run the pool filter continuously for 24 hours prior to initial
start-up.
4.2 Water Chemistry
Regular chlorine or bromine testing should be performed as normal.
Ozone will be eliminating the majority of contaminants. Therefore,
only a small amount of chemicals will need to be added to maintain
a minimal residual level of 0.5 - 1.0 ppm chlorine or 1.0 - 2.0 ppm
bromine. Ozone is pH neutral thus minimizing pH adjustments.
As a routine, test and adjust water chemistry to within the following
guidelines:
• pH: 7.4 – 7.6
• Total Alkalinity: 80 – 120 ppm
• Free Chlorine: 1.0 – 3.0 ppm
• Combined Chlorine (Chloramines): None (super chlorinate to
remove all chloramines)
• Chlorine Stabilizer (Cyanuric Acid): 30 – 50 ppm
• Calcium Hardness: 200 – 400 ppm
• Metals (Iron, Manganese): None
• Nitrates: None
• Phosphates: None
Bekijk gratis de handleiding van JANDY CD100, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | JANDY |
Model | CD100 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 2422 MB |