Step 1 - Suboor considerations
Joist notching/drilling
Joist drilling
Joist notching
To prevent excessive heat loss through the oor, ensure that insulation is
installed between the joist in line with building regulations.
If using temperature sensitive materials above Econna-12, such as
damp proong or tanking systems, contact the manufacturer for
advice.
Where ceramic tiles are to be used, ensure that the suboor meets
the local tiling standard requirements.
Do not commence installation of the Econna-12 panels without
ensuring that the resulting oor construction will meet the
requirements of the oors intended use and its nish.
The images above are for guidance only, please refer to building
regulations for full information on how to notch/drill into joists.
Joists must be level and even, clear of debris and without any surface
deviations such as knots of nails before laying the Econna-12 panels
Joists will have to be drilled or notched in line with building regulations to
allow for the ow and return pipes to enter the room. Ensure the notches
or holes are large enough to allow for the expansion and contraction of the
pipes. All exposed pipework within the joist spaces must be insulated.
0.25 of span
0.4 of span
0.25 of span
0.07 of span
Limits of notches
in joists
Limits of holes
in joists
Maximum notch
depth of 0.125 x
depth of joist
Maximum hole diameter
of 0.25 x depth of joist

Bekijk gratis de handleiding van Warmup VLo Econna-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelVLo Econna-12
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6226 MB