Warmup Tectora handleiding
Handleiding
Je bekijkt pagina 9 van 28

9
Step 1 - Suboor considerations
Joist notching/drilling
Joist drilling
Joist notching
To prevent excessive heat loss through the oor, ensure that insulation is
installed between the joist in line with building regulations.
If using temperature sensitive materials above Tectora, such as
damp proong or tanking systems, contact the manufacturer for
advice.
Where ceramic tiles are to be used, ensure that the suboor meets
the local tiling standard requirements.
Do not commence installation of the Tectora without ensuring that
the resulting oor construction will meet the requirements of the
oors intended use and its nish.
The images above are for guidance only, please refer to building
regulations for full information on how to notch/drill into joists.
Joists must be level and even, clear of debris and without any surface
deviations such as knots of nails before laying Tectora.
Joists will have to be drilled or notched in line with building regulations to
allow for the ow and return pipes to enter the room. Ensure the notches
or holes are large enough to allow for the expansion and contraction of the
pipes. All exposed pipework within the joist spaces must be insulated.
0.25 of span
0.4 of span
0.25 of span
0.07 of span
Limits of notches
in joists
Limits of holes
in joists
Maximum notch
depth of 0.125 x
depth of joist
Maximum hole diameter
of 0.25 x depth of joist
Bekijk gratis de handleiding van Warmup Tectora, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Tectora |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8419 MB |







