Warmup Foil Heater handleiding

42 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 5 van 42
5
Installation summary
Test the resistance of the heating
mat after installation and check
against the previous value to
ensure no damage has occurred.
At the end of the mat, you will
nd a termination joint. As with
the coldtail joint at the beginning
of the heating mat, this joint will
have to be cut into the underlay
so that it sits at the same height
as the heater�
9
Install the oor sensor centrally,
300mm in between two parallel
runs of heating cable and away
from other heat sources such as
hot water pipes, lighting xtures,
chimneys etc. Do not cross the
sensor over the heating elements�
7
Lay your chosen oor covering
over the heating system�
For LVT / Vinyl / Laminate oor
coverings Warmup Dual Overlay
MUST be installed rst.
10
Test the resistance of the heating
mat after the oor has been
laid to check against previous
values to ensure no damage has
occurred.
11
Install your Warmup thermostat
referring to their installation
instructions� The system must be
connected to and controlled with
a thermostat and sensor.
12
8

Bekijk gratis de handleiding van Warmup Foil Heater, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelFoil Heater
CategorieNiet gecategoriseerd
TaalNederlands
Grootte11009 MB