Vevor GQ-100D handleiding

275 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 14 van 275
- 13 -
objects.
The path from carrying the machine to the work site should be smooth.
2. Check the dredged pipe, if possible, find the starting point, identify the elbow,
the clear distance, the distance to the main pipeline and the blockage, chemical
substances, etc. If there is a chemical substance, to understand its composition,
and take safety protection measures and so on. If necessary, facilities such as
birdbasins may be removed, which may hinder the operation of the machine or
damage the cables.
3. Select the suitable dredging equipment:
dredging machine can not dredge the blockage of the sewage well pipeline.
4. Ensure that the machine has been checked.
5. If necessary, lay protective pads on the ground because the dredging operation
is dirty.
6. Please take the usual road. If you move up the stairs, please watch the machine
slip and put on the appropriate protective shoes.
7. The machine is two feet from the entrance, too long can cause cable distortion
and knots. If not, it can be connected to the inlet with the appropriate size pipe and
the cable through the extension pipe .Incorrect cable protection measures can
cause cable distortion, knotting or even fracture, or harm to the operator.
8. Use an extension pipe to protect the steel cables
9. Dredge the head selection: the correct choice is to clean the pipe with an outer
diameter of at least 1in less than the inner diameter of the pipe.
10. Access to the power supply, if the wire length is not enough, please add the
extension cord.
PAY ATTENTION TO:
To avoid electric shock or fire, strictly use various extension lines with the following
requirements.
This cable must have a ground wire.
When used outdoors, a cable with a W or W-A identification must be used.
This cable shall have an insulation layer of sufficient thickness ( 16 AWG-100 feet).
Preparation work before the operation:
1. Preparation before dredging the pipe with 5 / 8 steel cables:
(1) Check the working area: With enough brightness.

Bekijk gratis de handleiding van Vevor GQ-100D, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkVevor
ModelGQ-100D
CategorieNiet gecategoriseerd
TaalNederlands
Grootte49458 MB