Supermicro SuperBlade SBA-4114S-T2N handleiding

100 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 24 van 100
24
Chapter 2: Installation and Setup
2. The spring-loaded Force Frame will raise up after the last screw (#1) is removed. Gently
allow it to lift up to its stopping position.
3. Lift the Rail Frame up by gripping the lift tabs near the front end of the rail frame. While
keeping a secure grip of the Rail Frame, lift it to a position so you can do the next step
of removing the External Cap.
Note: The Rail Frame is spring loaded, so keep a secure grip on it as you lift it so it does
not snap up.
Figure 2-4. Raising the Force Frame
Rail Frame
PnP Cover Cap
Figure 2-5. Lifting the Rail Frame

Bekijk gratis de handleiding van Supermicro SuperBlade SBA-4114S-T2N, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSupermicro
ModelSuperBlade SBA-4114S-T2N
CategorieNiet gecategoriseerd
TaalNederlands
Grootte17306 MB