Singer Ditto handleiding

26 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 6 van 26
6
To Assemble the Beam
1. Press and hold the clips on the sides of the bubble
level.
2. Slide the bubble level into the tracks
of the lower beam with the bubble
facing the joint to the upper beam.
3. Slide the bubble level approximately 10 in. (25 cm)
down the lower beam.
4. Put the lower beam and the upper beam on the floor
or on a table.
5. Slide the lower beam and the upper beam together
(A).
6. Push and turn the lock knob (B) clockwise to lock the
beams together.
7. Loosen the base knob (C) of the beam to
allow the spring loaded foot to extend.
A
B
C
8. Lean the beam against a wall. Put the foot pad on
the floor approximately 1 ft. (30 cm) from the wall.
1 ft.
Note! Make sure that the height of the ceiling where
you assemble the beam is the same as the height of
the ceiling of the work area.
9. While standing on the foot pad, extend the
telescoping piece and raise the beam until it touches
the corner where the wall meets the ceiling. The
telescoping base will extend as you raise the beam.
10. Tighten the base knob when the upper beam is
touching the corner.
11. Now that the beam is set to the correct height, move
the beam to the work area.
Caution! Make sure that the beam is positioned
in an area where it can not be easily be bumped into
or hit while in operation mode.
12. With the beam at an angle, position the foot of
the beam about 1 in. (2.5 cm) from the workspace,
ensuring the flat side of the beam is facing the work
area.
13. Grip the beam and press it down towards
the floor to depress the spring loaded foot.

Bekijk gratis de handleiding van Singer Ditto, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSinger
ModelDitto
CategorieNaaimachine
TaalNederlands
Grootte2624 MB