Scheppach PX-UG-2000R handleiding
Handleiding
Je bekijkt pagina 17 van 28

w ww.practixx.com
GB
|
17
8.2 Setting the tool stand (1) up (Fig. 4+5)
1. Press the spring pin locking lever (11) and fold the
frame legs (9) out.
2. Once the spring pin locking lever (11) latches into
the intended position (3), the frame leg (9) is locked.
3. Repeat this process for the other frame legs (9).
4. The frame legs (9) can be adjusted for uneven
surfaces.
5. Place the tool stand (1) on the frame legs (9). Turn
the adjustable foot tip (13) on the frame leg (9)
clockwise or anti-clockwise until the tool stand (1)
is securely on the oor. Lock the adjustable foot tip
(13) with the lock nut (18).
6. Fold in the frame legs in reverse order until the
spring pin locking levers (11) are latched into the
intended position (2).
8.3 Extend the tool stand extension (7) (Fig. 5)
1. The tool stand extension (7) width can be adjusted
using the grip screws (16).
8.4 Fitting the transport wheels (14) (Fig. 6+7)
1. Fit the wheel axle (15) to the machine tool stand
(1) using the Phillips screws M8 (C), spring washer
M8 (F), washer M8 (E) and nut M8 (D).
2. Fit a safety ring (B) on both sides of the inner
groove.
3. Slide the transport wheel (14) onto the wheel axle
(15) and secure it with a securing ring (B).
4. Repeat this process with the second transport
wheel (14).
8.5 Fitting the workpiece supports (5) (Fig. 5)
1. Insert the workpiece support (5) into the recep-
tacle on the tool stand (1) and use the star grip
screws (6) to ax it.
2. The height of the workpiece support (5) can be ad-
justed using the star grip screws (6).
3. Repeat this process with the second workpiece
support.
8.6 Fitting the support arms (Fig. 8)
1. Fit the support arms (17) to the tool stand (1) by pull-
ing the support arm locking lever (12) upwards and
keeping it held to unlock it. Attach the support arm
(17) to the grab handle side of the tool stand (1) rst.
2. Lower the rear of the support arm (17) down onto
the tool stand (1) and press the support arm lock-
ing lever (12) down. This xes the support arm (17)
to the tool stand (1).
3. Disassembly is carried out in reverse order.
Min. / max. spacing
of the supports
1000-2000 mm
Max. permissible
payload
200 kg
Weight 16.7 kg
7. Before commissioning
Make sure that the product has not been damaged
during transport. Transport damage must be reported
immediately to the forwarding agent that made the de-
livery.
• Open the packaging and carefully remove the prod-
uct.
• Remove the packaging material, as well as the pack-
aging and transport safety devices (if present).
• Check whether the scope of delivery is complete.
• Check the product and accessory parts for transport
damage. In the event of complaints the carrier must
be informed immediately. Later claims will not be
recognised.
• If possible, keep the packaging until the expiry of the
warranty period.
• When ordering please provide our article number as
well as type and year of manufacture for the product.
WARNING!
The product and the packaging material are not
children‘s toys! Do not let children play with plas-
tic bags, lms or small parts! There is a danger of
choking or suocating!
8. Attachment and operation
m Attention!
Always make sure the product is fully assembled
before commissioning!
8.1 Fitting the transport handle (8) (Fig. 3)
1. Place the tool stand (1) on the oor or on a work-
bench so that the frame legs (9) point upwards.
2. Position the transport handle (8) with the holes on
the outside of the tool stand (1). See Fig. (3)
3. Fasten the transport handle (8) to the tool stand (1)
with two M8 cylinder head screws (C), M8 spring
washers (F) and M8 washers (E).
Bekijk gratis de handleiding van Scheppach PX-UG-2000R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Scheppach |
Model | PX-UG-2000R |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 3420 MB |