PowerWalker Solar Inverter 5000 ZRO handleiding
Handleiding
Je bekijkt pagina 23 van 84

21
L1 phase
When the units are operated in
3-phase application, please
choose “3PX” to define each
inverter.
It is required to have at least 3
inverters or maximum 9
inverters to support three-phase
equipment. It’s required to have
at least one inverter in each
phase or it’s up to four inverters
in one phase. Please refers to
5-2 for detailed information.
Please select “3P1” in program
28 for the inverters connected to
L1 phase, “3P2” in program 28
for the inverters connected to L2
phase and “3P3” in program 28
for the inverters connected to L3
phase.
Be sure to connect share current
cable to units which are on the
same phase.
Do NOT connect share current
cable between units on different
phases.
L2 phase
L3 phase
29
Low DC cut-off voltage:
If battery power is only
power source available,
inverter will shut down.
If PV energy and
battery power are
available, inverter will
charge battery without
AC output.
If PV energy, battery
power and utility are all
available, inverter will
transfer to line mode
and provide output
power to loads.
Default setting: 42.0V
If self-defined is selected in
program 5, this program can be
set up. Setting range is from
40.0V to 54.0V. Increment of
each click is 0.1V. Low DC cut-off
voltage will be fixed to setting
value no matter what
percentage of load is connected.
32 Bulk charging time
auto-charging time (default)
5min
If “User-Defined” is selected in program 05, this program can be
set up. Setting range is from 5min to 900min. Increment of each
click is 5min. Otherwise, Keeping auto-charging time.
Bekijk gratis de handleiding van PowerWalker Solar Inverter 5000 ZRO, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | PowerWalker |
Model | Solar Inverter 5000 ZRO |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 9555 MB |