Pro Series Ozone Generator
Step 4. Install a Water Check Valve (if applicable)
If pool equipment is mounted above the water line, a check valve
must be installed between the pump outlet and the Injector Manifold
to prevent the pump from draining and losing its prime (when not in
use).
Use check valve: PN: R06925.
NOTE: If a check valve is used, do not install immediately after chlorine
feeders.
Step 5. Perform a System Pressure Test (if applicable)
IMPORTANT:
If it is necessary to pressure test a new equipment system,
perform pressure test before connecting the ozone gas line.
Install the 3/4” pipe cap provided onto the manifold injector
before performing the pressure test.
Store the pipe cap inside the ozone generator housing for future
use.