Gys flash 148.12 CNT FV handleiding
Handleiding
Je bekijkt pagina 39 van 72

39
GYSFLASH 108.12 / 148.12 / 158.12 CNT FV
EN
39
Gysash 1 Gysash 2
System
being
supplied
Gysash 1
System
being
supplied
Gysash 2
X
OK NOK
• Method n°2 : With parallelisation modules (PHM + SHM) Multi-charger Mode
These Gysash units can also be parallelized using an SHM module, which manages communication between the
various Gysashes (via the SMC ports) and a PHM module, which connects the various power outputs together to
form a single, more powerful output.
See the SHM and PHM parallelisation module manuals for more details on installation and use.
Note: The Gysash units connected must be identical.
Compatible modes:
CHARGE SUPPLY AUTO-SELECT POWER-UP
SHM
PHM
Communication
Power
I1
Master Slave 1 Slave 2 Slave 3
I2
I3 I4
I1 + I2 + I3 + I4
System
being
supplied
Bekijk gratis de handleiding van Gys flash 148.12 CNT FV, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Gys |
Model | flash 148.12 CNT FV |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 9530 MB |