Goodwe Polaris BMT-P2/144A handleiding

36 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 9 van 36
BMT-P2/144A(550W)P9
STANDARD INSTALLATION MANUAL FOR POLARIS 580W (HOOP INSTALLATION)
5
INSTALLATION WORK OF PRODUCT
5.1 PRODUCT ROOFING INSTALLATION
Unpacking and stacking
● DO NOT stack the product boxes after unpacking. (Cut the outer packing tape connecting
the two tow products and separate the upper and lower tow).
● The storage of the product should ensure that the outer packaging is intact, and the storage
area should be protected from dampness, direct sunlight, and waterproof measures should be
taken to prevent the pallets and packaging boxes from getting wet;
● The product storage area should be d, at and the ground should be with a slope of less
than 10°
● A safety distance of 30cm between the boxes is recommended
● DO NOT stack other items on top of the products or packing boxes
● DO NOT unpack in the rain, as the caon will be soft and may damage the products.
Therefore, it is recommended to avoid working on rainy days
● DO NOT car products when working outdoors in the wind. It is advised to x the
disassembled products to avoid the damage caused by wind
● Please stack the products in a ventilated, rain-proof and d place before unpacking them.;
● Please use scissors or utility knife to cut o the packing strips, do not scratch the glass, and
conrm the number of products in time after opening the box;
● A suppo should be placed behind the product to prevent it from collapsing after unpacking.
● The products should not be unpacked before long distance transpoation. Sho on-site
single piece manual transpoation is acceptable.
● Please wear protective gloves during unpacking and handling to avoid scratching your hands
or leaving ngerprints on the glass.
● Eve product should be carried by two people. Do not pull on the junction box under any
circumstances. It is advised to grasp the sides of the tile when caring it.
● Use scissors to cut o the ties holding the connecting wires before installation to avoid the
connector striking the back and damaging the product;
● Put the remaining products together in a centralized location after installation
Roof substrate acceptance check
The installation position of steel structural columns should be accurate, ensuring that the
columns are perpendicular to the horizontal plane, and the installation should be rm.
The weld should achieve: uniform appearance, good formation, smooth transition between
welds and between weld and base metal, and clean removal of weld slag and spatter.
The main keel plane should be at and have sucient strength, and the drainage slope should
meet the design requirements (as shown in Figure 1). It is recommended that the drainage
slope be between 6° and 10° and not less than 6° .

Bekijk gratis de handleiding van Goodwe Polaris BMT-P2/144A, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelPolaris BMT-P2/144A
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8693 MB