Goodwe GW50K06-ETC handleiding
Handleiding
Je bekijkt pagina 46 van 74

42
08 System Commissioning
User Manual V1.2-2024-10-30
8 System Commissioning
8�1 Indicators and Buttons
8�2 Setting Inverter Parameters via LCD
NOTICE
• The LCD display automatically turns on and enters the main page after the inverter is
powered on.
• A password is required to access the settings page, contact the after-sales service center to
obtain one.
• Inverter rmware version shown in this document is V00.0. Coummunication version: V1.0.
The screenshots are for reference only. The actual interface may dier.
• The name, range, and default value of the parameters are subject to change or adjustment.
The actual display prevails.
• The power parameters should be set by professionals. To prevent the generating capacity
from being inuenced by wrong parameters.
LCD Button Description
Direction button
Enter button
Exit button
• Short press the direction button: switch to submenus or adjust the parameter values.
• Short press the enter button: go to the next level submenu.
• Long press the enter button: set the parameters after adjusting the values.
• Short press the exit button: back to the upper level menu.
Indicator Status Description
ON=INVERTER POWER-ON
OFF=INVERTER POWER-OFF
ON=SYSTEM IS READY
BLINK=SYSTEM IS STARTING UP
OFF=SYSTEM IS NOT OPERATING
ON=FAULT HAS OCCUREED
BLINK=BURN-IN MODE
OFF=NO FAULT
Operating
Power
Fault
Bekijk gratis de handleiding van Goodwe GW50K06-ETC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Goodwe |
| Model | GW50K06-ETC |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8531 MB |







