Goodwe GW50K06-ETC handleiding

74 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 47 van 74
43
08 System Commissioning
User Manual V1.2-2024-10-30
Display screen icon description
No� Icon Description
1 Date Time
Check the time in the country/region where the inverter is
located.
2
Low voltage ride
through(LVRT)
Indicates that the inverter's LVRT is enabled.
3
High voltage ride
through(HVRT)
Indicates that the inverter's HVRT is enabled.
4 LVRT&HVRT Indicates that the inverter's LVRT&HVRT are enabled.
5 Power grid type Indicates that the power grid adopted star connection.
6 Power limit Indicates that the inverter's power limit is enabled.
7 Safety code Displays the current safety code of the inverter.
8 Solar panel -
9 Battery -
10 Load -
11 Power grid -
12 Commnunication method Display the communication method of the inverter.
13 Status information Display the status information of the inverter.
Check communication connection
Example:

Bekijk gratis de handleiding van Goodwe GW50K06-ETC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelGW50K06-ETC
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8531 MB