Eibenstock BST 250 handleiding

76 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 15 van 76
15
The scope of delivery includes a mounting
plate, a 10 mm key and
four M8 x 25 hexagon socket screws. The
mounting plate is placed on the machine
with the key and secured with the four
screws.
Pay attention to the mounting direction.
Insert the core drill with the attached mounting plate into the drill rig and lock
it with the turnstile (see picture above).
The operating instructions and the associated safety in-
structions must be strictly observed when operating the
core drilling machine!
Operations
In order to operate the tool safely, please observe the following notes:
Details of the work area
Keep the work area free of everything which could obstruct operations.
Provide for adequate illumination of the work area.
Adhere to the regulations concerning the power connection.
Lay the power cable in such a way that any damage by the drill can be
avoided.
Make sure to always keep the work area in view and to be able to reach
all necessary operating elements and safety installations.
Keep other persons away from your work area in order to avoid acci-
dents.
Space requirements for operating and maintenance
Whenever possible, keep a free space for operating and maintenance of
about 2 m around the drill position, so that you can work safely and have
immediate access in case of a failure.

Bekijk gratis de handleiding van Eibenstock BST 250, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkEibenstock
ModelBST 250
CategorieNiet gecategoriseerd
TaalNederlands
Grootte11311 MB