Berner Architectural Recessed 12 handleiding
Handleiding
Je bekijkt pagina 5 van 16

-5-
A. The Architectural Recessed 12/16 series air curtain enclo-
sure is equipped with four 13mm holes on the top of the
unit for suspended mounting. See Figure 4.
For lighter lifting the blower assembly may be removed
so that the enclosure can be easily installed.
See Section VII: SERVICE for instruction on removing the
blower assembly.
B. The electrical junction box(s) is located on the outside of
the enclosure on the left side (standard) of the unit.
C. Determine the exact mounting location of the air curtain
unit.
D. Create structural attachment points to suspend the unit
above the ceiling so that the unit is centered and parallel
with the door opening.
E. Suspend air curtain cabinet by attaching threaded rods to
the unit and support structures. Adjust unit position so
the bottom of the cabinet is ush with the underside of
the ceiling.
F. Install the front and back trim using the provided fasteners.
See Figure 4.
G. Finish o ceiling edge as required.
NOTE: Finishing materials must not overlap the bot-
tom of the cabinet to allow the intake screen to operate
freely.
H. If the blower assembly was removed, re-install it along
with nozzle surround and bottom access cover.
I. Proceed to Section IV – ELECTRICAL CONNECTIONS
All electrical wiring and connections MUST be performed by
qualied personnel in accordance with the latest edition of the
National Electrical Code ANSI/NFPA No. 70 or, in Canada, the
Canadian Electrical Code, Part 1-C.S.A. Standard C22.1 and local
codes and regulations.
MAKE SURE THE CORRECT VOLTAGE AS MARKED
ON THE UNIT IS USED.
A. Check the rating nameplate on the unit for supply voltage
and current requirements. A separate line voltage supply
with a suitable branch circuit protection device should be
run directly from the main electrical panel to the unit. A
disconnect switch for each branch circuit is a required part
of this installation. See the voltage label on the unit for
circuiting and total electrical load.
B. All eld wiring must be copper with a minimum insulation
of 60°C within approved conduit. If any of the wire sup-
plied with the unit must be replaced, it must be replaced
with copper wiring with a minimum insulation of 90°C.
C. Electric, steam and hot water heated air curtains are fac-
tory equipped with an air curtain mounted solid state
temperature sensor cable located in the j-box. Depending
on where the temperature is to be measured, the sensor
may be left on the end plate or positioned elsewhere. Do
not put any clamps on the rubber coated tip.
D. Remove the junction box cover.
E. Connect all supply and control circuit wires according to
the wiring diagram provided.
IV. ELECTRICAL CONNECTIONS
Figure 3
Figure 4
III. MOUNTING INSTRUCTIONS (General)
Installation location
of front trim
Inlet screen
Surround Nozzle
Installation
location
of back trim
Adjustable discharge vanes
Intelliswitch
display
Bottom
access
cover
Holes for suspension
J-box
Installed
length trim
Bekijk gratis de handleiding van Berner Architectural Recessed 12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Berner |
Model | Architectural Recessed 12 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 4496 MB |