Warmup VLo Ultra-12 handleiding

32 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 4 van 32
4
Please also read the full instructions that follow this section.
Installation summary
For bonded constructions in dry
areas a high temperature acrylic
adhesive can be used to bond the
Ultra-12panelstothesuboor.
Presstheboardsdownrmly
into the adhesive to create the
necessary adhesion.
Starting from the manifold
locationttheservicepanels
following the pipe layout shown
on the working drawings.
For bends use the curve service
panels, snapping or cutting the
straight service panels at 45° and
butting them tightly together.
Ensurethesuboorisclean,dry
and prepared to an SR1 standard.
Seesuboorconsiderationspage
for more information.
For bonded constructions in wet
or dry areas and compatible
S1orS2exibletileadhesiveis
recommended.
Presstheboardsdownrmly
into the adhesive to create the
necessary adhesion.
Fit the curve panels at the end of the room referring to the working
drawings.
Inlltheheatedareawiththestraightpanels.
Theplainpanelscanthenbeusedinareaswhereunderoorheatingwill
not be installed, i.e. under kitchen units.
1 2
3 4
5
SR1
2 m < 3 mm

Bekijk gratis de handleiding van Warmup VLo Ultra-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelVLo Ultra-12
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8703 MB