Step 4 - Lay the pipe
•Ensurethereisexcessowand
return pipe at the manifold
location which can be cut later
after the pipe has been laid.
Plan the circuit layout ensuring
thattheowandreturnpipes
can connect from the manifold
to their respective heated area
without crossing each other.
1
3
If the project has been supplied with a set of working drawings, follow
the provided pipe layout. Ensure each circuits details are recorded in the
commissioning log provided in the Warmup manifolds installation manual.
Attach pipe bend supports to
hold the pipe at a 90° angle as
itenterstheoor.Positionthe
support so that the pipe rises
straight to the manifold with
approximately half the support
withintheoor.
Leave a 150mm space the width
of the manifold arms to allow for
the curve pipe supports.
4
Before installing the pipework
ensure the adhesive has cured
where used. Sweep or vacuum
the panels to clear any debris.
2
Feed pipes normally go through doorways but to minimise
congestion, pipes can be fed through walls. Ensure holes drilled
inthewallarebelowoorlevelandthepipeisprotectedwitha
conduit.

Bekijk gratis de handleiding van Warmup VLo Ultra-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelVLo Ultra-12
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8703 MB