Each mat and sensor must be tested before they are installed,
once they have been laid but before tiling or laying levelling
compound and again before they are connected to the thermostat.
The resistance (ohms) should be measured and recorded in the
control card at the end of the manual.
Due to the high resistance of the heating element, it may not be
possible to get a continuity reading from the heating cable and
as such, continuity testers are not an acceptable substitution for
testing. When checking resistance, make sure your hands do not
touch the meter’s probes as the measurement will include your
internal body resistance and render the measurement inaccurate.
If you do not get the expected results or at any time you believe
there may be a problem, please contact Warmup for guidance.
Testing information
• Set a multimeter or ohmmeter to
record resistance in the range of
0-500 Ω. Measure the resistance
across the live (brown) and
neutral (blue) wires. Ensure the
measured resistance is within the
Reference Resistance Band for the
cable size being tested
• Set a multimeter or ohmmeter
to record resistance in the range
of 1 MΩ or greater if available.
Measure the resistance across
the live (brown) and neutral (blue)
wires to the earth braid.
Ensure the measured resistance
is showing as greater than
500 MΩ or innite if the meter
cannot read this high.
Mat resistance test Earth fault test
Bekijk gratis de handleiding van Warmup VLo Nexxa-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | VLo Nexxa-12 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 4711 MB |