Warmup VLo Econna-12 handleiding

28 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 5 van 28
5
Before installing the pipework in
the panels it is advised to sweep
or vacuum the oor area to clear
any debris.
Install the pipe in line with the
projects working drawings.
Econna-12 panels are structural,
therefore additional pipe
channels must not be routed.
Installation summary
Measure and cut the pipe so
that it reaches both the ow and
return ports on the manifold.
Refer to the manifold manual
for detailed information on
mounting, pressure testing and
commissioning.
Use Warmup pipe bend supports
where the pipe exits the oor at
the manifold location.
Lay a minimum 6 mm ooring
grade plywood in the opposite
direction to the Econna-12 panels.
This layer must be screwed to the
Econna-12 panels to complete the
structural deck.
The plywood should be positioned
so that each plywood panel
overlaps the tongue and groove
edges of the Econna-12 panel by
300 mm.
Lay your chosen oor covering
in accordance with oor
manufacturers instructions.
Before installing the nal
Econna-12 panel, drill another
12.5 mm hole in this last panel at
a 20° angle where the return pipe
needs to drop into the joist space.
Feed the pipe through the hole
through to the manifold location,
notching/drilling the joists as
required in line with building
regulations.
7
8
9 10
11
Install your Warmup
thermostat referring to their
installation instructions. The
system must be connected to and
controlled with a thermostat and
sensor.
12

Bekijk gratis de handleiding van Warmup VLo Econna-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelVLo Econna-12
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6226 MB