Warmup Tectora handleiding
Handleiding
Je bekijkt pagina 13 van 28

13
Step 4 - Install diuser plates
• In the service pipe location, do not install diuser plates until the service
pipes are installed in the joist space and fed to the relevant room
locations.
5
3
4
• The sensor must be installed
centrally onto a joist. Create a
notch in the joist for the sensor
tip and run the sensor cable in
the joist space to the thermostat
location.
• The diuser plates where the
sensor is to be located must be
cut back 25mm on all sides.
Test the resistance of the oor
sensor at this stage
Bekijk gratis de handleiding van Warmup Tectora, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Tectora |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8419 MB |







