Warmup Tectora handleiding
Handleiding
Je bekijkt pagina 11 van 28

11
• The joist space must be pre-insulated with rigid insulation in line with
building regulations.
• Rigid insulation must be installed with its top surface 19mm below the
top of the joists, such that it properly supports the Tectora diuser plate
and the installed pipe.
• For the service pipes, install a thinner layer of insulation at a lower level
to support the service pipes.
1
2
Step 3 - Install insulation
Bekijk gratis de handleiding van Warmup Tectora, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Tectora |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8419 MB |







