Warmup Metro handleiding

28 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 9 van 28
9
Step 1 - Suboor considerations
The concrete suboor must be clean, level, solid, structurally sound and
dimensionally stable. Ensure the suboor is prepared to an SR2 standard
(SR2 - the maximum permissible departure over a 2 m straight is 5 mm).
If necessary an appropriate blinding layer should be applied.
Any materials on or within the suboor must be suitable for
supporting underoor heating systems. If using temperature
sensitive materials beneath the heating cable, such as damp
proong or tanking systems, contact the manufacturer for advice.
Where tiles are to be used, ensure that the suboor meets the
local tiling standard requirements.
Do not commence installation without ensuring that the resulting
oor construction will meet the requirements of the oors
intended use and its nish.

Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelMetro
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7455 MB