Warmup Metro handleiding
Handleiding
Je bekijkt pagina 10 van 28

10
Step 2 - Suboor preparation
• Lay a damp proof membrane
over the suboor to prevent
water ingress.
• Lay insulation board over
the membrane referring to
manufacturer instructions and in
line with building regulations
• Ensure the insulation board is
pressed against the perimeter
strip�
• Fold the polyethylene skirt over
the vapour control layer and tape
into position�
• Install perimeter strip around the
perimeter of the room to allow for
dierential movement between
nished oor level and walls.
• Tape the perimeter strip to the
wall to hold in position.
• Lay a vapour control layer over
the insulation to prevent moisture
ingress.
• The suboor must be clean,
solid, structurally sound and
dimensionally stable. Ensure the
suboor is prepared to an SR2
standard (SR2 - the maximum
permissible departure over a 2 m
straight edge is 5 mm).
• If necessary a blinding layer
should be applied.
1 2
4
6
3
5
Ensure the perimeter strip is
installed with the integrated
polyethylene skirt facing out
from the wall.
Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Metro |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7455 MB |







