Warmup Metro handleiding
Handleiding
Je bekijkt pagina 4 van 28

4
Please also read the full instructions that follow this section.
Installation summary
• The suboor must be clean, level,
smooth, dry, frost-free, solid,
suitably weight-bearing and
dimensionally stable.
• Lay a damp proof membrane
over the suboor to prevent
water ingress.
• Install perimeter strip around the
perimeter of the room to allow for
dierential movement between
nished oor level and walls.
• Lay insulation board over the
membrane. Insulation should be
chosen and installed in line with
building regulations.
• Lay a vapour control layer over
the insulation to prevent water
ingress.
• Lay the Metro rail across the oor,
perpendicular to the intended
pipe runs�
• The rst rail must be placed
300mm from the wall and the 2nd
300mm from the 1st. Then, space
the rails at 1m centres ensuring
the pipe slots are aligned.
• Install the pipe in line with the projects working drawings. It is
recommended the pipe is installed using a double meander pattern as
this provides a more even surface temperature and higher heat output
than a single meander pattern.
• Install the pipe at the necessary spacing, alternating the rst run between
3 times and 1 times the design pipe spacing, before working back to the
manifold location securing into the Metro rail�
1 2
3 4
5
SR2
2 m < 5 mm
Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Metro |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7455 MB |






