Warmup Metro handleiding
Handleiding
Je bekijkt pagina 14 van 28

14
Step 4 - Lay the pipe
• Install the sensor at least
300 mm into the heated area it
will be controlling. It should be
located centrally between the
closest parallel runs of pipe and
not in an area inuenced by other
heat sources.
• The sensor can be secured to the
suboor with tabs of tape.
8
DO NOT tape over the sensor
tip it must be in full contact
with the screed layer.
• Measure and cut the pipe so
that it reaches both the ow and
return ports on the manifold.
• Refer to the manifold manual
for detailed information on
mounting, pressure testing and
commissioning.
7
• Install pipe conduit or lagging over the service pipes as this will insulate
the pipes and alleviate any hotspots.
6
Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Metro |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7455 MB |







