Step 4 - Lay the pipe
5A
Beginning from the manifold location, following the projects working
drawings, begin laying the pipe, maintaining a gap of half the design pipe
spacing around the perimeter of the room.
• It is recommended that a double meander pattern can be used, as this
will provide a more even surface temperature and higher heat output
than a single meander pattern.
• The pipe should be laid referring to the working drawings, alternating
the rst run between 3 times and 1 times the design pipe spacing, before
working back to the manifold location, securing into the Metro rail.
• For the pipe bends, secure the pipe to the insulation layer using Warmup
clips at the beginning, middle and end of each bend.
• If using the single meander method, ensure the pipe installed against
the external walls is supplied with the hottest (supply) water. Meander up
and down the oor area at your designed pipe spacing, securing into the
Metro rail and feed the pipe back towards the manifold.
• For the pipe bends, secure the pipe to the insulation layer using Warmup
clips at the beginning, middle and end of each bend.
5B
Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Metro |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7455 MB |