Setting Programs:
Program
Description
Selectable option
01
Output source
priority: To configure
load power
source priority
Solar first
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient to
power all connected loads,
battery energy will supply power
the loads at the same time.
Utility provides power to the
loads only when any one
condition happens:
- Solar energy is not available
- Battery voltage drops to either
low-level warning voltage or the
setting point in program 12.
Utility first (default)
Utility will provide power to the
loads as first priority.
Solar and battery energy will
provide power to the loads only
when utility power is not
available.
SBU priority
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient to
power all connected loads,
battery energy will supply power
to the loads at the same time.
Utility provides power to the
loads only when battery voltage
drops to either low-level warning
voltage or the setting point in
program 12.
SUB priority
Solar energy is charged first and
then power to the loads.
If solar energy is not sufficient to
power all connected loads,
Utility energy will supply power
to the loads at the same time.
Note:SUB priority is just for
PVmax=500Vdc model.
Bekijk gratis de handleiding van Vevor EM5500-48L, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Vevor |
| Model | EM5500-48L |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 56647 MB |