Part C: Installing Dock Leveler
1.) Once the pit concrete has cured adequately, check the actual, finished dimensions of the pit
and dock leveler. The leveler is 23 1/2" tall at the front and back (all dimensions nominal). The pit
should be 23
3
/
4
" deep at the rear and 24" deep at the front.
2.) To make up the difference between the height of the dock leveler and the depth of the pit,
place steel shims on the floor of the pit where the dock leveler frame will sit. Use shims to level the
dock leveler front-to-back and side-to-side. More shims are required in front because of the slope
of the pit floor.
3.) Set the dock leveler in place, e.g. using a crane or a fork truck.
4.) Adjust the shims to make the top of the dock leveler flush with the finished floor.
5.) Tack weld the back of the dock leveler to the back of the pit.
6.) Tack weld the shims to the frame of the dock leveler (front and rear). Tack the front shims to the
curb angle (if included in your order).
7.) Operate the leveler and confirm normal operation. (See Instruction Manual for your leveler).
8.) Finish welding the leveler to the back of the pit. Weld the entire back edge of the dockleveler
to the rear panel.
WELD BACK OF
DOCK LEVELER
TO REAR WALL
PANEL
WELD SHIMS TO
FRONT CURB (IF
CURB INCLUDED IN
YOUR ORDER). ALSO
WELD SHIMS TO
FRONT FRAME OF
DOCK LEVELER.
Page 4 of 5
9.) Finish welding the leveler to the front curb. Weld the entire front edge of the dockleveler
to
the curb.
Bekijk gratis de handleiding van Vestil RR-65-25, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | RR-65-25 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 848 MB |