MODEL #
PIT FLOOR WIDTH &
OPENING WIDTH
PIT FLOOR
LENGTH
RR-65/EH-65 80" 53"
RR-66/EH-66 80" 65"
RR-68/EH-68 80" 89"
RR-610/EH-610 80" 113"
RR-75/EH-75 92" 53"
RR-76/EH-76 92" 65"
RR-78/EH-78 92" 89"
RR-710/EH-710 92" 113"
INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)
Part A: Prepare the Site & Make the Floor
1.) Prepare (concrete) dock wall and pit floor as
shown in the diagrams. Pit floor should taper from
back to front. The front of the pit should be 1/2"
lower than the back. Tapering the floor facilitates pit
cleaning and allows to pit to drain to the outside of
the building.
2.) The installation site should be excavated such
that the rough grade of the area surrounding the pit
slopes gently from the rough grade of the
surrounding floor to the bottom of the pit floor.
DOCK
WALL
FRONT CURB (RECOMMENDED)
(3" x 3" x 1/4" ANGLE WITH "J" ANCHORS)
PIT FLOOR
LENGTH
PIT FLOOR
WIDTH
24" PIT
HEIGHT
OPENING
WIDTH
FRONT
CURB
AREA
SURROUNDING
PIT SHOULD
SLOPE FROM
ROUGH
GRADE OF
FLOOR TO
BOTTOM OF PIT
BACK
FRONT
Vestil Manufacturing Corp.
2999 North Wayne Street, P.O. Box 507, Angola, IN 46703
Telephone: (260) 665-7586 Toll Free (800) 348-0868 Fax: (260) 665-1339
Web: www.vestilmfg.com E-mail: info@vestil.com
Page 1 of 5
Bekijk gratis de handleiding van Vestil RR-65-25, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | RR-65-25 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 848 MB |