Vestil MEZZ-200 handleiding

11 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 8 van 11
Table of Contents Rev. 7/27/2020 MEZZ-200 MANUAL
Table of Contents Copyright 2020 Vestil Manufacturing Co. Page 8 of 11
Select a location for the mezzanine gate system that is close to the edge of the upper level. Assemble the gate
following the instructions on pages 8 and 9. Move the gate assembly into position and anchor it to the surface by
installing
3
/
8
” anchor bolts through the 4 bolt holes in each post mounting bracket. The length of the anchor bolts
should be determined by a qualified and trained individual, e.g. your building engineer.
Top gate
Bottom
gate
Side
gate
Upper level
INSTALLING THE GATE SYSTEM
39
7
/
16
in.
Lower level
Post mounting bracket
3
/
8
anchor
bolt

Bekijk gratis de handleiding van Vestil MEZZ-200, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkVestil
ModelMEZZ-200
CategorieNiet gecategoriseerd
TaalNederlands
Grootte2779 MB