Vestil MEZZ-200 handleiding
Handleiding
Je bekijkt pagina 8 van 11

Table of Contents Rev. 7/27/2020 MEZZ-200 MANUAL
Table of Contents Copyright 2020 Vestil Manufacturing Co. Page 8 of 11
Select a location for the mezzanine gate system that is close to the edge of the upper level. Assemble the gate
following the instructions on pages 8 and 9. Move the gate assembly into position and anchor it to the surface by
installing
3
/
8
” anchor bolts through the 4 bolt holes in each post mounting bracket. The length of the anchor bolts
should be determined by a qualified and trained individual, e.g. your building engineer.
Top gate
Bottom
gate
Side
gate
Upper level
INSTALLING THE GATE SYSTEM
39
7
/
16
in.
Lower level
Post mounting bracket
3
/
8
”
anchor
bolt
Bekijk gratis de handleiding van Vestil MEZZ-200, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | MEZZ-200 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 2779 MB |