50
5.System debugging
5.1 Startup check
Before operating, check and make sure that there is no damage on the energy storage system or exist
other potential hazards.
Number
Check items
1
The equipment is installed firmly, the installation position is convenient for operation and
maintenance, the installation space is convenient for ventilation and heat dissipation, and
the installation environment is clean and tidy.
2
The protective earth wire, grid-connected AC line, load line and communication line are
correctly and firmly connected.
3
The cable binding meets the wiring requirements, is distributed reasonably and has no
damage.
4
The battery cluster switch, AC switch and DC power supply switch have been
disconnected.
5
The voltage and frequency of the grid-connected access point of the energy storage
system shall meet the grid connection requirements of the country/region where it is
located.
5.2 The system is turned on
Step 1:Press the ON/OFF circular button of the high-voltage control box. When you hear the
sound of the relay engaging, check whether the display interface is a fault alarm.
Step 2:Rotate the selection handle ON the high-voltage control box to ON.
Step 3:Turn the DC circuit breaker ON.
Step 4:Turn on the inverter and check the operating data.
Step 5:Open the back and close the switches in sequence. Check whether the liquid cooling unit
is operating normally.

Bekijk gratis de handleiding van V-Tac VT-12341, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkV-Tac
ModelVT-12341
CategorieNiet gecategoriseerd
TaalNederlands
Grootte27251 MB