Step 1 Make sure the upstream inverter is in the OFF position.
Step 2 Make sure the air circut breaker and disconnector are in the OFF position.
Step 3 Lead the cable into the wiring area through the inlet hole, and mark the cable phase
sequence.
Step 4 Strip the protective layer of the cable to expose the copper core of the wire with strippers.
Step 5 Install the OT/DT terminal to the wire and crimp them with a crimping tool. Install a heat
shrink tubing to the terminal and heat it with a heat gun.
a. Put the stripped cable inside the cable lug.
b. Tighten the cable lug with relevant tools. Crimp it at least twice.
Cable protectors are advisable in the cable crosses if the multi-core cables are
used.
Step 6 Connect the cable.
a. Select bolts matching with the cable lug.
b. Attach the cable lug to the connection copper bar.
• If copper wires are used, connect the spare parts as described below:
System Manual 6 Electrical Installation
41
Bekijk gratis de handleiding van Sungrow MVS9000-LV, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Sungrow |
| Model | MVS9000-LV |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8876 MB |