Sungrow MVS9000-LV handleiding

88 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 31 van 88
5.4.2 Installating Oil-Water Separator (Optional)
Overview
The installation position of the oil-water separator is reserved at the bottom of the MV
Station,located on the backside of the MV Station, as shown in figure A below.
If the installation of the oil-water separator is needed, please contact SUNGROW customer
service or designated partners.
5.5
Installation Verification
Bolts and nuts are tightened.
The container is in good contact with and evenly supported by the bases underneath.
All container doors can be smoothly opened and closed.
5.6 Clearance Requirement
On site, MV Station works together with the inverter. Required clearances around MV
Station and the inverter are shown in the figure below(Unit in mm).
* The distance illustrated in this figure is the minimum values.
System Manual 5 Mechanical Installation
29

Bekijk gratis de handleiding van Sungrow MVS9000-LV, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSungrow
ModelMVS9000-LV
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8876 MB