Sungrow MVS9000-LV handleiding
Handleiding
Je bekijkt pagina 31 van 88

5.4.2 Installating Oil-Water Separator (Optional)
Overview
The installation position of the oil-water separator is reserved at the bottom of the MV
Station,located on the backside of the MV Station, as shown in figure A below.
If the installation of the oil-water separator is needed, please contact SUNGROW customer
service or designated partners.
5.5
Installation Verification
• Bolts and nuts are tightened.
• The container is in good contact with and evenly supported by the bases underneath.
• All container doors can be smoothly opened and closed.
5.6 Clearance Requirement
On site, MV Station works together with the inverter. Required clearances around MV
Station and the inverter are shown in the figure below(Unit in mm).
* The distance illustrated in this figure is the minimum values.
System Manual 5 Mechanical Installation
29
Bekijk gratis de handleiding van Sungrow MVS9000-LV, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Sungrow |
| Model | MVS9000-LV |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8876 MB |







