Structural Concepts Fusion GJDSS5RLB handleiding

25 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 25
10
INSTALLATION: REFRIG. LINE & DRAIN STUB-UP CONNECTION - MODEL GJDSS6RLB ONLY
7. Refrigeration Line Stub-Up Connection
Remove front panel/toe-kick. Refrigerant stub-up
access opening is at the front on the left hand
side of the base (as shown in illustration below).
See next page for Model GJDSS8RLB
refrigeration line stub-up connection layout.
8. Evaporator Coil Drain Connection
Coupler connection point is under the case on the
right hand side (as shown in below illustration).
Front panel/toe-kick may be removed to allow
access when connecting PVC drain tube to
coupler.
Maintain 1/4”-fall per foot to provide proper
drainage.
See next page for Model GJDSS8RLB evaporator
coil drain connection layout.
--- Case Rear ---
--- Case Front ---
Refrigeration
Lines Stub-Ups
Coupler
Note: Model GJDSS6RLB is Shown Above.
See Next Page for Model GJDSS8RLB Layout
Wire Raceway
Hat Channel
Wire Raceway
Note: Illustration Above May Not Reflect Every
Feature or Option of Your Particular Case
PVC Drain Tube (To Be
Attached To Coupler)

Bekijk gratis de handleiding van Structural Concepts Fusion GJDSS5RLB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GJDSS5RLB
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7913 MB