INSTALLATION, CONTD: REFRIG. LINES / STUB-UPS / DRAINS / WIRING DIAGRAMS / VENTILATION
15. Refrigeration Line Stub-Up Connections
(Remote Units)
Remove front panel.
Refrigerant stub-up access opening is at the
front on the left hand side of the base (see
illustration at top-right).
Stub-up connections are accessed from inside
the case.
Remove interior decks.
Remove fan shroud assembly.
Line connections are in the tub front, on the left
hand side
Remove foam material from the entry hole
provided in the tub drain trough.
Route refrigerant lines through access hole.
Run case-to-case connections through
cutouts in base.
Sweat the high and low pressure
connections.
Fill access hole with suitable filler to insure
watertight integrity of tub.
Illustration at top-right may not reflect every
feature or option of your particular case.
16. Refrigeration Drain Connection (Remote
Units)
Depending upon drain access needs, either front
or rear panel may be removed to gain access to
drain stub-up.
1.5” male PVC stub-up connection is under the
case on the right hand side.
Drain stub-up may be at case center in extended
length cases.
Connect tub drain to floor drain. Maintain
1/4”-fall per foot to provide proper drainage.
Illustration at top-right may not reflect every
feature or option of your particular case.
17. Condensate Pan / Drain Position
(Self-Contained Units)
Remove the front panel by lifting up & out.
Slide the condenser unit out from case.
Condenser unit access is now available.
Insure that the condensate pan is installed under
the PVC condensate drain trap.
Insure that the condensate pan is plugged into
the receptacle inside base.
Lower rear panel back into place.
See Drain, Hose and Bracket Placement
section in Operating Manual for details.
19. Ventilation and Clearance
Self-Contained refrigerated cases must
maintain airflow clearance of 6” (minimum) to
12” (recommended) at front and rear.
Restriction of air can void warranty.
Illustration below may not reflect every feature
or option of your particular case.
Check air grilles for obstructions.
Maintain airflow clearance of 6” (min.)
to 12” (recommended) at front & rear.
18. Electrical Wiring Diagram
Each case has its own wiring diagram
folded and in its own packet.
Wiring diagram placement may vary; it may
be placed near condenser fan cover,
ballast box, raceway cover, or other related
location.
Refrigeration
Line Stub-Ups
Access
Cutout
Drain Stub-Up (may be
at case center in
extended length cases)
Note: Illustration Below May Not Reflect Every
Feature or Option of Your Particular Case

Bekijk gratis de handleiding van Structural Concepts Fusion GHSS860RLB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GHSS860RLB
CategorieNiet gecategoriseerd
TaalNederlands
Grootte12857 MB