Structural Concepts Fusion GHS456R handleiding
Handleiding
Je bekijkt pagina 19 van 32

Fusion® User Manual 19
Atmosphere Cleaning and Maintenance
6-Month System Maintenance
Order lter by calling Watts at 1-800-224-1299
Item Needed: EDP# 7100110
Includes:
• (1) Sediment Filter • (1) Carbon Block Filter
Step A-Turn off the incoming water supply to the RO by turning the knob on the Adapt-A-Valve
TM
clockwise until it stops.
Step B-Open the RO Faucet and allow water to drain from the tank until it is completely empty.
Water may be saved in a container for drinking or to rinse system parts.
Step C-Let system sit for 10 to 15 minutes after the tank is empty to let the system depressurize before
attempting to remove lter housings.
Step D-For more leverage you may leave the RO module attached to wall of cabinet. If you are unable
to access the module while it is mounted, remove it prior to changing lters. Starting with the closet
housing (Stage 1), remove it by turning it clockwise (left), empty water, then discard lter.
Continue on to the 2nd housing (Stage 2) and the 3rd housing (Stage 3).
If you own a 4-stage system it will not have the third stage. A 4-stage system has two vertical
housings instead of three.
Step E-Clean the lter housings (bowls) with a mild soap solution and rinse with water. Check O-rings
and lubricate with water soluble lubricant. Petroleum base lubricants must not be used.
NOTICE: Before re-installing the lter bowls back on the the system, check O-rings to make sure
they are still in place. Do not over-tighten lter housing, over-tightening may damage O-ring(s),
cause water leaks, or affect system performance.
Step F-Insert a new sediment lter (cloth like appearance) into the 1st lter housing which is the one
on the water inlet side (green tubing from the Adapt-A-Valve
TM
) of the RO system, and re-install
housing.
Step G-Insert the new Carbon Block lter (white end caps & plastic netting ) into the second and third
lter bowls and re-install housings.
Step H-Turn water supply on the unit by turning the knob on the Adapt-A-Valve
TM
counterclockwise.
Step I-Open the RO faucet and leave it open until water begins to trickle out. (It will come out slowly).
Step J-Close the RO faucet allowing the storage tank to ll with water. It may take 4 to 6 hours to ll the tank completely
depending on the production capability of the membrane, local water temperature and water pressure.
Bekijk gratis de handleiding van Structural Concepts Fusion GHS456R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Structural Concepts |
Model | Fusion GHS456R |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 6215 MB |