6
5. Position & Align Case
a. Before adjusting levelers, make certain that the case is in proper position and, if required, aligned with adjoining
case(s).
b. This may require the repositioning of the case you are installing or the already
positioned case(s).
6. Adjusting Levelers
a. Important! After case is in proper position, levelers must then be LOWERED to
floor.
b. Adjust levelers so the case is level and plumb. Depending upon case weight, it
may be necessary to use a pry bar to do so.
c. Use adjustable wrench to adjust leveler.
d. DO NOT use pry bar on end panel as it may chip
e. Use pry bar ONLY on base frame to avoid damaging case.
f. See Illustration to the right.
g. Click link for reference video.
ARM Initial Setup | Structural Concepts
7. Opening E-Box
a. Locate small manilla envelope containing two (2) keys taped to front door.
b. Insert keys into the two (2) locks, above and below the touchscreen, and turn so flat part
of keys are parallel with ground.
c. E-Box door is held shut with magnets, it will take a bit of force to get the door open.
8. Powering On Case
a. Locate Main Power Switch on the Front Lower Left side of the Case and press on to start
refrigeration compressor [E].
b. Press and hold Power Button inside the E-Box to power on UPS [F].
Pry Bar
Adjustable
Wrench
Leveler
(Typical)
INSTALLATION: CASE REMOVAL FROM SKID / SETUP / ACTIVATION - PAGE 2 of 3
E
F
Bekijk gratis de handleiding van Structural Concepts Elevate BD3632IS, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Structural Concepts |
Model | Elevate BD3632IS |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 12552 MB |