User Manual
3. Installation
There are three sets of AC output terminals and the installation steps for both are the same.
The maximum temperature for connecting AC and battery terminals is 85°C.
3.8 AC Wiring
Figure 3.17 AC output terminals
DANGER
Before installing the AC cables, be sure that the OCPDs (breakers) are
turned off.
Use a multimeter to verify that the AC voltages are 0Vac before proceeding.
1. Bring the AC cables for the backup loads panel (backup) and the main service
panel (grid) into the inverter wire box. The backup loads panel should not be
electrically connected to the main service panel.
2. Strip 13mm from the ends of each cable. Crimp the R-type connectors onto the ends.
3. Remove the terminal bolts, insert them into the connectors, then use a torque wrench
to tighten the bolts down.
4. Please refer to the terminal labels to connect the AC wires to the correct terminals.
Model
Wire Size
Torque
Cable
6 AWG
18N.m
10 mm2
AC Gen/AC Backup/AC Grid
19
10 AWG
18N.m
4 mm2
GEN
VW
U
N PE VW
U
N PE VW
U
N PE
Backup Grid
Earth Bar

Bekijk gratis de handleiding van Solis S6-EH3P15K02-NV-YD-L, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSolis
ModelS6-EH3P15K02-NV-YD-L
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7082 MB