Sime Murelle 70 Box ErP handleiding
Handleiding
Je bekijkt pagina 3 van 56

All descriptions and illustrations provided in this manual have been carefully prepared but we reserve the right to make
changes and improvements in our products that may affect the accuracy of the information contained in this manual.
Important Information
IT IS A STATUTORY REQUIREMENT THAT ALL GAS APPLIANCES ARE INSTALLED BY COMPETENT PERSONS,
IN ACCORDANCE WITH THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS (CURRENT EDITION).
The manufacturer’s instructions must not be taken as overriding any statutory requirements, and failure
to comply with these regulations may lead to prosecution.
No modifications to the appliance should be made unless they are fully approved by the manufacturer.
GAS LEAKS: DO NOT OPERATE ANY ELECTRICAL SWITCH, OR USE A NAKED FLAME. TURN OFF THE GAS
SUPPLY AND VENTILATE THE AREA BY OPENING DOORS AND WINDOWS contact the gas emergency ser-
vice on 0800111999.
CONTENTS
1 DEVICE DESCRIPTION..................................................................... pag. 4
2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 9
3 CHARACTERISTICS ....................................................................... pag. 14
4 COMMISSIONIMG, USE AND MAINTENANCE .................................................. pag. 20
5 FAULT FINDING .......................................................................... pag. 31
6 APPENDIX 1 ............................................................................. pag. 32
USER INSTRUCTIONS ..................................................................... pag. 46
PRODUCT DETAILS ........................................................................................................................................ pag. 48
ANNEX AA.1 ................................................................................................................................................... pag. 49
Please refer to commissioning instructions for filling in the checklist at the back of this installation guide.
Note: All Gas Safe registered installers carry a ID Card.
You can check your installer is Gas Safe Registered by calling 0800 408 5577
IMPORTANT
Prior to switching on the boiler for the first time, check the following:
– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and that the earth wire is connected
to a good earthing system.
– Ensure that tightness and let by test have been conducted, including the internal gas pipe work.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been
properly installed.
– Make sure that any isolation valves are open.
– Make sure that the system is filled with water and is thoroughly vented.
– Check that the circulating pump is not jammed.
– Purge the gas supply pipe work.
– Ensure that the checklist is filled in when the commissioning has been completed.
Bekijk gratis de handleiding van Sime Murelle 70 Box ErP, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Sime |
Model | Murelle 70 Box ErP |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 8576 MB |