Sime Murelle 70 Box ErP handleiding

56 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 27 van 56
27
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service /
interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
: Gas Safe registration N
o
:
Max rate CO ppm CO
²
% CO/CO
²
Min rate CO ppm CO
²
% CO/CO
²
undertaken in accordance with manufacturers
instructions, and readings are correct?”
yes
Gas rate: m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturersinstructions. *
yes n/a
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
:Gas Safe registration N
o
:
Max rate CO ppmCO
²
%CO/CO
²
Min rate CO ppmCO
²
%CO/CO
²
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yesn/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
: Gas Safe registration N
o
:
Max rate CO ppm CO
²
% CO/CO
²
Min rate CO ppm CO
²
% CO/CO
²
undertaken in accordance with manufacturers
instructions, and readings are correct?”
yes
Gas rate: m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturersinstructions. *
yes n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
:Gas Safe registration N
o
:
Max rate CO ppmCO
²
%CO/CO
²
Min rateCO ppmCO
²
%CO/CO
²
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate: m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturersinstructions. *
yesn/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
: Gas Safe registration N
o
:
Max rate CO ppm CO
²
% CO/CO
²
Min rate CO ppm CO
²
% CO/CO
²
undertaken in accordance with manufacturers
instructions, and readings are correct?”
yes
Gas rate: m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturersinstructions. *
yes n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name: Company name:
Telephone N
o
:Gas Safe registration N
o
:
Max rate CO ppmCO
²
%CO/CO
²
Min rateCO ppmCO
²
%CO/CO
²
undertaken in accordance with manufacturers
instructions, and readings are correct?”
yes
Gas rate: m
3
/h OR ft
3
/h
delete as appropriate
YesNo
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturersinstructions. *
yesn/a
Comments:
Signature:

Bekijk gratis de handleiding van Sime Murelle 70 Box ErP, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSime
ModelMurelle 70 Box ErP
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8576 MB