2.7.2 - Connections
Thechoiceandsizingofthehydrauliclinesmustbemadebyanexpertwhomustoperateaccordingto
therulesofgoodtechniqueandthelawsinforce.
Tomaketheconnections:
- position the hydraulic lines
- tightentheconnectionsusingthe“spannerandcounterspanner”method(g.12ref.B)
- checkforanyleaksofliquid
- coattheconnectionswithinsulatingmaterial(g.12ref.C).
The hydraulic lines and joints must be thermally insulated.
Avoid partially insulating the pipes.
Do not over-tighten to avoid damaging the insulation.
Usehempandgreenpastetosealthethreadedconnections;theuseofTeonisadvisedwhenthereis
anti-freeze in the hydraulic circuit.
2.8 - CONDENSATION DISCHARGE
Thecondensationdischargenetworkmustbesuitablysized(minimuminsidepipediameter16mm)and
thepipelinepositionedsothatitkeepsaconstantinclination,neverlessthan1%.Intheverticalinstal-
lation,thedischargepipeisconnecteddirectlytothedischargetray,positionedatthebottomoftheside
shoulderunderneaththehydraulicxtures.Inahorizontalinstallationthedischargetubeisconnectedto
the one already present on the machine.
ForinstallationoftheSLversionsinahorizontalposition,horizontalcondensationcollectionbasin
accessorykitsareavailableSL.
- Ifpossible,makethecondensationliquidowdirectlyinagutterora“rainwater”discharge.
- Whendischargingdirectlyintothemaindrains,itisadvisabletomakeasiphontopreventbadsmells
returningupthepipetowardstheroom.Thecurveofthesiphonmustbelowerthanthecondensation
collectionbowl.
- Ifthecondensationneedstobedischargedintoacontainer,itmustbeopentotheatmosphereandthe
tubemustnotbeimmergedinwatertoavoidproblemsofadhesivenessandcounter-pressurethatwould
interferewiththenormaloutow.
- Ifthereisaheightdi󰀨erencethatcouldinterferewiththeoutowofthecondensation,apumpmustbe
mounted(accessorykit):
- in a vertical installation mount the pump under the lateral drainage tray;
-inahorizontalinstallationthepumppositionmustbedecidedaccordingtothespecicrequirements.
Inanycase,consultthespecicinstructionsinthecondensationdischargepumpkit.
However, on completion of the installation it is advisable to check the correct outow of the
condensation liquid by slowly pouring about ½ l of water into the collection tray in about 5-10
minutes.
2.8.1 - Mounting the condensation discharge device in the vertical version
Connecttothecondensationcollectiontraydischargeunion(g.13ref.A)apipefortheoutowofthe
liquid(g.13ref.B)blockingitadequately.Checkthatthedrip-collectorextension(g.13ref.C)ispresent
and correctly installed.
2.8.2 - Mounting the condensation discharge device in the horizontal version
TomountthehorizontalbowlontheSLversionsrefertotheinstructionsintherelativeoptionalkit.
- Belowthesidecorrespondingtothecondensatedraintubeoutlet,cutthepre-cutarea(g.14ref.A).
- Retthesidepanel.

Bekijk gratis de handleiding van Olimpia Splendid Bi2 SL SMART S1, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkOlimpia Splendid
ModelBi2 SL SMART S1
CategorieNiet gecategoriseerd
TaalNederlands
Grootte17464 MB