3.4 Installation Space
To ensure sucient space for installation and heat dissipation, reserve enough
space around the energy storage system. The requirements are as follows:
Install the four foot cups under the base, align the base with the wall, and ensure
that the base is 77mm~92mm away from the wall surface. Adjust the four foot
cups of the base until it is level.
Figure. 3-1 base installation diagram
3.5 Energy Storage System Installation
Step1: Base installation
RUN COM 25% 50% 75% 100%
300-600mm
300-600mm
≥300mm
wall
77-92mm
foot
14
• The operation and service life of the battery depend on the operating
temperature. Install the battery at a temperature equal to the ambient
temperature or in a better environment.
• The operating temperature of the battery system ranges from -20°C to +55°C. If
the battery system is installed in a cold environment, the built-in thermal control
system starts to heat the battery to achieve better performance. The heating
process consumes rechargeable power, which reduces the system energy
eciency in cold weather.
• If the battery system is stored in a cold environment (for example, 0°C) before
installation, the battery system needs some time (< 2 h) to heat up before it can
be charged. You are advised to place the battery system in a warm place before
installation to facilitate commissioning.
NOTE

Bekijk gratis de handleiding van Midea H1-(5-20)-E0, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkMidea
ModelH1-(5-20)-E0
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3049 MB