Master Kitchen HMK 90A3 MS-BS SP BK handleiding

84 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 5 van 84
INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
Mark Points:
● A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the hood
is to be fitted.
● A horizontal line A at
13201700 mm above the cooker top.
● A horizontal line B at a minimum 926 mm above the cooker top.
● A horizontal line C at a minimum 730 (910 optional) mm above the cooker top.
● Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference line.
● Repeat this operation on the other side, checking that the two marks are leveled.
● Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference line.
● Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
Optional
02 03 04
05 06 07 08
09 10 11 12

Bekijk gratis de handleiding van Master Kitchen HMK 90A3 MS-BS SP BK, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkMaster Kitchen
ModelHMK 90A3 MS-BS SP BK
CategorieAfzuigkap
TaalNederlands
Grootte7657 MB