Legrand Ensto Pro EVF200 handleiding

40 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 22 van 40
RAK112B_ENG / 2023-06-27
22 / 40
Installation steps
1. Assemble the concrete foundation adapter.
2. Attach the mounting box EVTL35.00 on the concrete foundation adapter EVTL37.00 and put the
assembly on the concrete foundation.
3. Attach the assembly in place. Use the screws on the concrete foundation.
4. Pull electrical cables through the ground mounting box cable gland(s) approx. 450 mm measured
from the upper surface of the mounting box.
5. Tighten the cable gland. Close the unused cable entries with cable gland plugs.
6. Open the maintenance door of the distribution cabinet.
7. Lift the distribution cabinet module on the mounting box and and attach it in place, max. tightening
torque 14 Nm.
8. Remove the supply cable sheath at the length of max. 200 mm.
9. Cut the supply cable conductors to applicable lengths. The earth conductor must be long enough,
so that if a fault occurs it is the last one that comes loose.
10. Strip the supply cable conductors 25 mm.
11. Connect the supply cable wires to the power connectors in the distribution cabinet.
12. Make sure proper strain relief to the cable by fastening the cable with e.g. MUPRO EuroQuick. Select
an applicable strain relief according to the cable diameter.
13. Connect the supply to the charging points with intervening connection cables. The intervening con-
nection cables are pre-connected to the power connectors in the distribution cabinet.
14. Pull the intervening connection cables rst down through the mounting box hole on the distribu-
tion cabinet side and then upp through the mounting box hole on the charging point side.
15. Open the maintenance door of one charging point.
16. Lift the charging point module on the mounting box and attach it in place with bolts, max. tighten-
ing torque 14 Nm.
17. Connect the intervening connection cable conductors to the supply terminal blocks located in the
maintenance space of the charging point, max. tightening torque 12 Nm.
18. Make sure that the PE is connected to the charging point.
19. Switch on F0, F1, F2 (if present) and QF1.
20. Install the other charging point module accordingly.
21. Attach the top cover plate on the charging station
modules with the washer and the screw included in
the delivery.
22. Close the maintenance doors.
Cable route
Cable entry
Top cover plate

Bekijk gratis de handleiding van Legrand Ensto Pro EVF200, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkLegrand
ModelEnsto Pro EVF200
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4463 MB