Handleiding
Je bekijkt pagina 8 van 16

7
4. Carefully and gently place the assembled frame on top of the screen material. Align the screen material corner with the
corner of assembled frame as the diagram below. In order to avoid puncturing the material, do not allow the angled edge of
the frame to come in direct contact with the screen.
5. With one end of the springs connected securely inside the groove of the frame, use the
Spring Hook (K)
to attach springs
to the holes located on the outer edge of the screen material. One hole on the horizontal outer edge matches one spring.
1) Attach the four corners first. Two people should use the
Spring Hook (K)
to attach springs to holes located on the outer
edge of the screen material in the order of 1-1→2-2→3-3→4-4, then 5-5→6-6→7-7→8-8.
Tip:
Each side will have one more spring for standby application.
Tip: Make sure the back of the screen material is facing
up as shown in this gure.
12
6
5
8
2 3 4
8
7
5
6
4
3
1
7
Step
①
Step
②
Step
③
Step
④
Align the corner
Top
Down
Bekijk gratis de handleiding van Hisense 120L9HTUKA, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Hisense |
Model | 120L9HTUKA |
Categorie | Televisie |
Taal | Nederlands |
Grootte | 1800 MB |