Hayward Plug N Clear handleiding

200 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 38 van 200
EN
English
8 Plug n Clear™ Salt Chlorinator
Contents
3.4.2. Installingandmountingtheelectrolysiscell
Position the holder such that the electrolysis cell can be inserted and removed without difficulty. Mount the holder onto the cut pipe
by tightening the union fittings as indicated below. Tighten the union fittings by hand as far as they will go. If the inspection marks
are visible, it means that the pipe has not been inserted sufficiently far into the electrolysis cell holder.
6
7
Check that the two sealing rings
of the electrolysis cell holder are
correctly positioned
Insert the electrolysis
cell holder then tighten
theunionttingsby
hand
Tighten by hand
IMPORTANT: The inspection marks
must not be visible.
Iftheyare,loosentheunionttingsandslide
the pipes further into the electrolysis cell, then
re-tighten
CheckthattheO-ringisinplacebeforeinsertingtheelectrolysiscellintothecellholder.
Position the flow switch at the entrance of the water flow.
25 cm
25 cm
8
O-ring
Pass the electrolysis cell connector through the tightening nut, as shown below, and tighten the tightening nut. Operate the filtration
pump for 5 minutes and check there are no leaks.
9 10
Connector
Tightening nut
Use only genuine replacement parts

Bekijk gratis de handleiding van Hayward Plug N Clear, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkHayward
ModelPlug N Clear
CategorieNiet gecategoriseerd
TaalNederlands
Grootte30048 MB